Architectural Competition for EPFL Library
(Ecole Polytechnique Fédérale de Lausanne -- Switzerland):
Viewpoint of Technical Panel

Marie-Françoise Bisbrouck

Université Paris - Sorbonne, 108 Boulevard Malesherbes, 75850 Paris Cedex 17, France
Marie-Francoise.Bisbrouck@paris4.sorbonne.fr

The slides of this paper can be found at:http://www.zhbluzern.ch/LIBER-LAG/PP_LAG_06/Friday/AymoninRittmBisbrouck-EPFL.pdf

Introduction

The architectural competition launched by the Ecole Polytechnique Fédérale de Lausanne (EPFL) for the Learning Center saw ideas from 12 architecting concerns competing at international level. A major feature of the competition - other than the programme actually defining the future building - was the extreme variety and architectural wealth of the candidate proposals. In my view, such a level of diversity was made possible by the size of the available plot, and the absence of constraints imposed on the architects.

It was specified in the programme that:

The architects were also to take account of the special environment, centring on the presence of the magnificent lake forming the site’s backdrop.

The results of the architectural competition may be basically classified into four major categories:

In the framework of this contest, two experts in library science were appointed by the School to analyse the functional part of the twelve competing projects:

Mel Collier and myself did not work together, in order to avoid influencing one another. In effect, I believe that it was preferable to work separately because it is indispensable to ‘get into’ projects without any preconceived ideas, especially when the projects are very complex. It was therefore only a few days before meeting the members of the jury that we discovered our respective analyses of the projects. I will mention this more in a moment.

Selecting a methodology for analysing the projects

The purpose of analysing projects by a technical committee is to inform the members of the jury, but even more so the Contracting Authority, as to the qualities and shortcomings of the competing projects, in order to throw light on the various choices, the difficulty - for the panellists - being to avoid passing judgement on the projects. Our role, in fact, is to consider only the library-management aspect of the projects, knowing that the technical committee comprises other experts who will study the projects from the viewpoint of structure, energy consumption, technical feasibility and notably, cost. It will then be up to the Contracting Authority, in charge of the operation, to assume its choices, and have the same accepted by the local authority responsible for operating the building, and for a period extending over several decades.

Given the size of the areas involved (13,000 useful m2, that is 17 to 18,000 m2 with circulation and plant rooms) and wealth of the programme, we received only very small-scale plans (2 millimetres per metre), saved to a CD-ROM. We also received hard copies in A3 format, which is also very small. And, since the drawings are only sketches, analysing each projects has to be limited to the major sections only.

We received no coercive guidelines from EPFL for managing our analyses. Our brief was to study the twelve competing projects in terms of the functionality of the library areas with regard to the other areas. Both for Mel Collier and myself, however, it was obvious that our assignment could not be completely dissociated from other aspects associated with the other very rich components of the Learning Center programme, and the very architecture of the proposed buildings, such as:

These considerations may appear anecdotal or external to the field of the survey entrusted to us; but for myself, on the contrary, they constitute the very essence of a project, for a building that has to serve several decades’-worth of users. In my view, architecture should help people to live better, to exist in an appropriate and harmonious setting, to offer correctly dimensioned but not hemmed-in areas, neither too vast nor too small, pleasant to move around in; a building that sharpens the curiosity of its users and visitors, constantly offering them a new manner of seeing things; yet a building that retains a human dimension; a building whose uses are able to evolve over time, depending on changing needs. These points, in any case, form my philosophy...

From a strictly more functional viewpoint, I tried concentrating on analysing the following points:

A very detailed analytical report was written up for each of the twelve projects, with, in certain cases, recommendations for members of the jury and the Contracting Authority.

The following table gives a synthetic report of the main criteria studied, for the final report by the jury members, in relation to the programme criteria regarding desired proximity between departments. The successive items analysed are:

In table 1, I have used only five of the twelve projects to illustrate quite basically how major differences can exist between projects, and to draw attention to the fact that, even though a project answers a large part of the criteria regarding proximity to services as requested in a programme, this fact does not necessarily make the project a good project in terms of the overall functionality, nor in terms of image.


Figure-1: DILLER SCOFIDIO + RENFRO, New-York.

Figure- 2: MECANOO Architecten, Delft.

Figure-3: OMA Stadebouw BL, Rotterdam

Figure-4: SANAA, K. Sejima + R. NISHIZAWA, Tokyo.

Figure-5: Xaveer De GEYTER, Brussels.

Table 1:

 

 

DILLER SCOFIDO

 

MECANOO

 

OMA (Koolhaas)

 

SANAA

XAVEER De GEYTER

Total number of library levels (includ research extension), & number for Public Services & Internal Library Departments

7 levels includ. 6 public and 1 level for the internal personnel departments.

3 levels includ. 3 for public and 1 for internal departments, but 2 public levels comprise several floor plates accessed by ramps.

13 small levels and 1 large tiers, including 10 for the public and 3 for internal departments.

 

(18 levels in total)

2 levels include. 2 for public and 1 for internal departments

2 levels out of total of 10 for the building, include. 2 for public and 1 for internal departments.

Access to research collection via Multimedia Library

YES

NO

2 dissociated accesses

YES

YES

YES

Research extension adj. to research collection

YES

2 adjoining levels

YES

YES

Superimposed levels

YES

YES

Access to Training Department via Multimedia Library

YES

Too many levels

NO

Proximity YES, but direct access unsure …

YES

YES

Proximity to Training Department and Internal Library Departments

NO

levels 3 and 7

AVERAGE

1 level difference

YES

YES

On the same level but somewhat remote.

CRAFT to proximity to Internal Library Departments

NO

levels 3 and 7

AVERAGE

1 level difference

YES

YES

On the same level but somewhat remote.

Proximity to Internal Café and Multimedia Library

YES

NO

1 level difference

YES

YES

YES

Exhibits included in Main Hall

?

YES

?

YES

YES

Security and monitoring of collections and materials

POOR

Too many levels or half-levels. Cf. elevator access

Crucial point for functionality of project

VERY POOR due to excessive number of levels.

Crucial point for this project.

Excessive number of entrances (> 8) gives excessive permeability of areas, preventing any monitoring.

POOR

Problem with all lifts serving all 10 levels of the building.

General functionality of the Library

POOR

Too many levels, problem communicating with the “wings” of the building at certain levels. Problematic shelving of collection by staff (stepped levels not served by ramps).

However, an extremely attractive and powerful building, numerous differentiated areas, very rich in possibilities, very open.

VERY GOOD for the Multimedia Library, but problem of access to the research collection, and problems regarding security of collections.

Very simple, very legible and genuinely attractive building.

Re-examine location of cafeteria and the Internet Café.

Check overhead lighting of the building.

VERY POOR because of the architectural scheme. Juxtaposition of departments. Areas are considerably broken up. Overall legibility is not obvious. It is unclear how the levels communicate. Each floor-step seems to function independently even if they are contiguous …

A very “hard” building psychologically: climbing the various levels becomes somewhat of a task.

VERY POOR

The library is very spread out: separate activities become a hotchpotch.

Very few enclosed spaces (lack of partitioning). Curved facades offer reduced functionality and are difficult to accommodate in the useful areas of the various departments.

Checks and monitoring are impossible. Problems with noise and draughts. Nonetheless, a fine poetic statement.

General functionality is excellent, over 2 vast floor plates (except for security of collections and deliveries).

High degree of flexibility, good natural lighting.

Nonetheless, the scale of the building in the environment remains a question …

More than these tables, which it is impossible to examine in detail, because this would entail being acquainted with each of the projects in particular, I think that it is more interesting to look at table 2 that EPFL drew up for the jury meeting from the two overall projects analyses produced by Mel Collier and myself. The synthetic aspect of this table is obviously highly condensed, and for a long while this posed a problem for me, because Mel Collier and myself had diverged heavily in our analysis of certain of the projects, in particular the one which ended up winning the competition - the Tokyo architecting firm of SANAA!

Table 2:

Architects

Mel Collier

Marie-Françoise Bisbrouck

1. Du Besset-Lyon

 

 

2. Vacchini

 

 

3. Abalos and Herreros

 

 

4. SANAA

 

 

5. Herzog & De Meuron

 

 

6. OMA (Rem Koolhaas)

 

 

7. De Geyter

 

 

8. Mecanoo

 

 

9. Ateliers Jean Nouvel

 

 

10. Diller Scofidio

 

 

11. Olgiatti

 

 

12. Zaha Hadid

 

 

 

Excellent

Good

Not satisfactory

Very unsatisfactory
(avoid)

 

 

 

 

Examining this table, you may understand my puzzlement with regard to the project submitted by SANAA, since Mel and myself were poles apart in terms of overall assessment of functionality!

In conclusion

I would just like to say that I found this operation very gripping, because it was an opportunity to dive into the very centre of architectural creation. The work leaves me with one regret and one wish.

My regret concerns the attitude of the jury to our work as library-management specialists. Our analysis, which we had conducted with extreme attention to the desires expressed in the total requirements issued in the Contracting Authority’s programme, was not sufficiently taken into consideration by the jury members, as if the analysis were of no interest for them in relation to the projects they had to judge; it was as if they were simply judging a fine architectural object, without any real content, and having no future users! We were prevented from even briefly presenting our work to the jury, project by project, since the architect members of the jury obviously had no desire to hear librarians discussing the functionality of the projects. Thus, 15 days’ of frantic analysis work resulted in less than 30 minutes of floor time for the two of us, and solely in the form of excessively fast questions-and-answers, where we practically had to answer by “yes or “no”, which allowed little room for nuance! But it must be said that the jury meeting itself lasted hardly longer that a single morning...

This attitude, which I have no regret in qualifying as “scornful”, once again poses the question of the make-up of juries for architectural competitions. There are too many architects in these juries, in the event, for the EPFL, nine architects out of twelve jury-members, and only a single librarian!

Nonetheless, the fact remains that the work we undertook apprised the School of the major advantages and disadvantages of each project and, in particular, the prize-winning project, which will allow the client to be firm on their architect by demanding a genuine “realignment effort” in order to make the project correspond to reality...

EPFL made an excellent choice in asking twelve big-name architects to compete. The contest resulted in the expression of extremely powerful architectural creativeness for no less than nine projects out of the twelve.

None of the projects was perfect - all included certain difficulties, some greater than others, relating to functionality, points on which the experts drew the attention of the Contracting Authority.

In terms of the scale of the building, the prize-winning project is not a “significant building” as the Contracting Authority seemed to require in its programme. The project that was chosen is the lowest project height-wise, and the one with the most modest volume-for-height, even if the ground footprint is considerable.

The jury choice was for a “poetic” project, one that jumps out from the ordinary, not through its outside force or magnificence, but by its extreme internal fluidity; a project that could almost be qualified as “extravagant”, opting outright for fluidity between areas; a project which appears to preclude - of its own initiative - any potential excesses of behaviour on the part of users (no one shouts, no one steals documents, either from the library or the bookstore; a project where no kitchen smells sneak out of the restaurants, and where everyone has a good pair of legs and can negotiate heavy inclines, et cetera.). In short, quite a “Zen” project!

We were all very attracted by this project, and even though I may seem quite critical of it, I actually experienced a particular sensitivity to it, as if this project embodied, of itself, the promise of a better world, a hassle-free world. I think it had a certain effect on us - one of a gentle oasis, with its numerous patios and slopes inviting promenades. In sum, a fascinating project overall, one we hope will truly function, and which must now be made to work without breaking the delicate intrinsic harmony it presents. The whole question is of knowing whether it will be possible....